GLOBAL COAL TRANSITION DASHBOARD
Seeing the whole pipeline: what shared project data reveals about accelerating the coal transition
Research into the coal-to-clean transition is growing, but the information needed to coordinate it is fragmented and often confidential. Bringing partner pipelines together shows where activity is concentrated, where it stalls, and what could help more plants move from study to transition.
Momentum, but plants are not yet retiring
Coal transition is at an inflection point. In 2025, the world added more coal capacity (3.5% growth) but used less coal power (0.6% generation decrease).1
As wind and solar meet most new demand in China and India, coal plants are increasingly kept as backup rather than relied on.1 Yet, nearly 70% of coal units scheduled to retire in 2025 stayed online.1
1 GEM (2026) Boom and Bust Coal 2026
Despite this, the Just Energy Transition Partnerships, the Asian Development Bank’s Energy Transition Mechanism, the Climate Investment Funds’ Accelerating Coal Transition programme, the Coal to Clean Credit Initiative (CCCI) and the Coal Asset Transition Accelerator (CATA) have helped move coal transition into the mainstream of energy transition finance by coordinating efforts of funders, technical partners and including asset owners in the conversation. Nor is it usually for lack of clean alternatives. Work by CATA and its partners points to the same binding constraints: rigid long-term power purchase agreements (PPA), unclear governance to approve early retirement, grid limitations, and the cost of retiring plants early. Finance for early retirement can follow once these are addressed, but rarely before.
A fragmented picture
Coal-to-clean transactions are, and should remain, confidential until terms are agreed. However, the confidentiality that protects live deals also means lessons from completed work are rarely pooled. Each organisation sees its own part of the picture, and nobody sees the whole. That gap has real costs. Two partners can approach the same asset owner without knowing it, sending mixed messages. Funders have little sense of where the wider pipeline is strong or thin. And because stalled projects are rarely recorded, the same obstacles may be met again elsewhere. The opportunity is not to try and open up live transactions, but to give partners a framework to share, at their discretion, what they have already worked on.
What the CATA portfolio shows
Of the fifteen projects in the CATA portfolio, eleven have been completed (nine technical assistance (TA) and two knowledge products) and a pipeline of +20 projects has been identified globally. Activity is concentrated in Asia, most often Southeast Asia, and a small number in Latin America.
All completed TA projects sit at the pre-transaction end of the process: pre-feasibility studies, technical options assessments, financial modelling and just transition planning. They span operating grid-connected plants, captive coal serving industry, a planned plant assessed for clean alternatives before construction, and fleet-level retirement planning. Where capacity is recorded the plants covered by completed and ongoing work total more than 10GW, ranging from around 100 MW to almost 3 GW. Projects now in delivery look further ahead: building bankable portfolios of replacement projects, connecting asset owners with finance and technology providers, and integrating renewables and storage into the grid. Some of them focus specifically on the grid, reflecting how often grid limitations determine whether a plant can retire.
Recommendations: accelerating asset-level transition
The CATA portfolio points to several steps that can help more plants move from study to transition, which are set out below.
- Start with credible assets and willing counterparties. Detailed asset-level work depends on owners and stakeholders who are committed to the outcome and able to share information. Prioritising these opportunities makes it more likely that analysis leads to action.
- Look at the whole asset early. Completed projects show that technical feasibility is rarely the deciding factor on its own. The strongest approached bring technical and economic analysis together with financial modelling, financing option, policy consideration and just transition planning. This shows early which financial, contractual, policy, grid or social barrier is holding back an asset.
- Plan what replaces the plant, not just when it closes. Projects now in delivery are focused on bankable replacement projects and grid integration. Retirement is more credible when transition and replacement options are assessed with a clear plan for the power, services, revenue and jobs that follow.
- Treat the grid as a first-order issue. Grid limitations should be tested at the outset rather than discovered once a retirement pathway has been agreed. This is particularly relevant where coal assets play critical roles in local power systems.
- Address the process in stages, towards a transaction. Support should build in depth as opportunities mature, from feasibility through commercial due diligence and financial modelling, with follow-on funding concentrated on opportunities that have a credible route to implementation.
Building a shared view of the pipeline
Acting on these recommendations at scale requires a clearer picture of activity beyond any single programme. To support this, CATA has developed the Global Coal Transition Dashboard, a single view of coal transition projects, showing where work is taking place, at what stage, and with what result. It is intended for funders and delivery partners working on coal transition.
Sharing information depends on trust. Much of what is most useful, including lessons from past projects, is commercially sensitive, bound by legal agreements and easy to attribute a small field. Partners are more willing to share with a trusted intermediary that checks information and controls how it is used, so shared views need to start curated and aggregated, becoming more open as confidence grows. The picture will always be partial as some work operates at country level rather than plant level and early-stage projects have gaps.
The dashboard can provide strategic insights by supporting four steps: collate non-confidential information from past projects; draw out lessons for all partners; add non-sensitive information on current and future projects at partners’ discretion; and use all three to build a strategic view of where support is most needed. This depends less on technology than on agreement among partners on: lightweight sharing arrangements, a common taxonomy, clear confidentiality protections and regular updates through existing partner forums.
No tool will make coal transition simple. But a shared, trusted view of who is doing what, where and with what result can help target technical assistance where it can unlock action, avoid duplicated effort and build pipelines of projects that are ready to move.